Wind Mitigation Form Explained: Every Question and Answer on OIR-B1-1802
Quick answer
The wind mitigation form is Florida’s Uniform Mitigation Verification Inspection Form, OIR-B1-1802. Since April 1, 2026, inspections use the Rev. 04/26 version: 6 pages and 9 questions, each answered with a letter or a checkbox. Your insurer reads those letters to decide which wind mitigation credits apply. For roof deck, roof-to-wall and opening protection, the weakest feature found sets the answer, and a signed form stays valid for up to 5 years.
The wind mitigation form is the document behind every wind mitigation credit in Florida, yet most homeowners only ever see it as a PDF full of checkboxes that their agent asks for. This guide reads it with you, question by question, so you know what each letter on your report means and what could change it.
If you have not booked the inspection yet, start with our guide to the wind mitigation inspection: it covers the visit, prices and the most common mistakes. This page is the companion for the paperwork. Every answer option below was checked against the official PDF from the Florida Office of Insurance Regulation, as described in how we verify our guides.
Table of Contents
Wind mitigation form at a glance: the 9 questions
Read this table first. It lists every question on the wind mitigation form, the answers it allows and what the inspector needs to see before marking the strongest one.
| # | Question | Possible answers | Strongest answer | Proof the inspector looks for |
|---|---|---|---|---|
| 1 | Building Code | A, B, C, D | A, B or C (code-era answers) | Permit application date and year built |
| 2 | Region | HVHZ, Region 1, 2 or 3 | Not graded: it describes your location | Design wind speed for the address |
| 3 | Roof Slope | 6:12 or steeper, or flatter than 6:12 | Not graded: it describes the roof | Slope of at least two-thirds of the main roof |
| 4 | Roof Covering | A, B, C, D (in 4.2) | A or B | Roof permit date or product approval number |
| 5 | Roof Deck Attachment | A to H | C, D or E | Attic photos of nails, spacing and sheathing |
| 6 | Roof to Wall Attachment | A to I | D or E | Attic photos of each connection type |
| 7 | Roof Geometry | A, B, C | A (hip) or B (flat, 5+ units) | Roof perimeter or roof area measurements |
| 8 | Sealed Roof Deck (SWR) | A, B, C | A | Underlayment, tape or foam, seen or documented |
| 9 | Opening Protection | A, B, C, N, X, Z (with .1 to .3) | A.1 | Product approval labels or paperwork for every opening |
Where to get the official wind mitigation form, and which version counts
The only official source is the Florida Office of Insurance Regulation (OIR). Its wind mitigation resources page links to the current Rev. 04/26 PDF and to the older Rev. 01/12 PDF. Both carry the code OIR-B1-1802. The revision label in the page footer tells you which one you are holding.
- Rev. 04/26 (current). 6 pages, 9 questions. The Florida CFO says it must be used for all inspections from April 1, 2026.
- Rev. 01/12 (prior). 7 questions. Inspections done before April 1, 2026 could use it.
- Older reports at Citizens. In its March 19, 2026 bulletin, Citizens says it will keep accepting the Rev. 01/12 form if it was completed within the five years before April 1, 2026.
You cannot fill in the wind mitigation form yourself and send it to your insurer. Florida Statute 627.711 says insurers must accept the form when a qualified inspector signs it, and the form lists who that is: a licensed home inspector with the required hurricane mitigation training, a certified building code inspector, a licensed general, building or residential contractor, a professional engineer, a professional architect, or anyone else your insurer recognizes. Your part is the homeowner signature at the end, which confirms the named inspector did the visit and showed you identification.
How the wind mitigation form is laid out
Before the questions, page 1 has a header block. It records the inspection date, the owner, the property address and county, the insurance company and policy number, the year of the home and the number of stories. Check these first: a wrong policy number or address is an easy reason for an agent to send the report back.
Then come the 9 questions, each with lettered answers and blank lines for dates, approval numbers or measurements. The form ends with three parts: the qualified inspector’s certification, signature and license number, a note on who may sign, and the homeowner’s signature and date. The form also says each attribute marked in questions 2 to 9 needs at least one photo or document as proof.
Question by question: every answer on the wind mitigation form
Here is what each question asks and what each letter means, in plain English. Where the wind mitigation form says to mark the weakest feature, one corner of the house can decide the answer for the whole home.
1. Building Code
This question asks which building code was in force when the original permit application was filed. It looks at the house as first built, not at later upgrades.
- A. Built under the 2001 or 2004 Florida Building Code. Homes built in 2002 or 2003 need a permit application dated after March 1, 2002.
- B. Built under the 2007 Florida Building Code or later. Homes built in 2007 or 2008 need a permit application dated after December 8, 2006.
- C. Miami-Dade and Broward (the High-Velocity Hurricane Zone) only: built under the 1994 South Florida Building Code. Homes built from 1994 to 1996 need a permit application dated after September 1, 1994.
- D. Unknown, or the home does not meet A, B or C.
What changes it: nothing you can retrofit. If your home is from a borderline year, the permit application date from your county or city is what lifts it from D to A, B or C.
2. Region
New on the 2026 wind mitigation form. It records where the home sits by design wind speed, using the ASCE 7-22 standard (700-year return period, Risk Category 2). The form points inspectors to the ASCE Hazard Tool to look it up.
- HVHZ: the High-Velocity Hurricane Zone.
- Region 1: 140 mph or more.
- Region 2: 130 to 139 mph.
- Region 3: under 130 mph.
What changes it: nothing. It describes your location, not your house. Just check that it is filled in.
3. Roof Slope
Also new. The inspector marks whether the slope that covers at least two-thirds of the main roof area is 6:12 or steeper, or flatter than 6:12. A 6:12 roof rises 6 inches for every 12 inches it runs. Like question 2, it describes the house rather than grading it.
4. Roof Covering
Part 4.1 is a grid with one row per covering type: asphalt or fiberglass shingle, concrete or clay tile, synthetic or composite tile, metal, built-up, membrane, and other. For each one on your roof, the inspector writes a permit application date or a Florida Building Code or Miami-Dade product approval number, plus the year it was installed. If none of that can be found, the inspector checks a box saying no compliance information was available.
Part 4.2 then gives the answer:
- A. All coverings meet the Florida Building Code: a product approval current at installation, a roof permit application dated on or after March 1, 2002, or an original roof on a home built in 2004 or later.
- B. All coverings have a Miami-Dade product approval current at installation, or, in the HVHZ only, a roof permit application dated after September 1, 1994 and before March 1, 2002, or an original roof on a home built in 1997 or later.
- C. One or more coverings do not meet A or B.
- D. No coverings meet A or B.
What changes it: paperwork, mostly. A re-roof done under permit is the usual way to reach A. If your roof was replaced but nobody can find the permit, you may be stuck at C or D. Our guide to the roof inspection for insurance explains how insurers look at roof age separately from this question.
5. Roof Deck Attachment
This is the first attic question on the wind mitigation form. It asks how the roof sheathing (the plywood or OSB under the shingles) is fastened to the rafters or trusses, and the inspector marks the weakest method found.
- A. Plywood or OSB at least 7/16 inch thick on framing no more than 24 inches apart, held with staples or 6d nails at 6 inches along the edges and 12 inches in the field. Batten decking under wood shakes also lands here, as does any system rated to at least 55 psf of uplift but less than B or C.
- B. The same sheathing held with 8d common nails no more than 12 inches apart in the field, or any system rated to at least 103 psf.
- C. The same sheathing with 8d common nails no more than 6 inches apart in the field, dimensional lumber or tongue-and-groove boards with at least 2 nails per board (1 if the board is 6 inches wide or less), or any system rated to at least 182 psf.
- D. Reinforced concrete roof deck.
- E. Spray foam products rated at 110 psf of uplift, applied where the rafters meet the deck and along all panel joints.
- F. Other, described by the inspector. Thinner decking or wider spacing than A lands here.
- G. Unknown or unidentified.
- H. No attic access.
What changes it: a re-roof is the usual moment, because the deck is exposed and can be re-nailed to a stronger pattern. Ask the roofer to write the nail size and spacing on the invoice. Without proof, the inspector can only mark what they can see from the attic.
6. Roof to Wall Attachment
The second attic question records the weakest connection between the roof framing and the top of the walls. Hip or valley jacks within 5 feet of a corner are left out when the inspector picks the weakest one. Our roof-to-wall diagram shows the main levels side by side. The full list of answers is:
- A. Toenails. Nails driven at an angle through the truss into the top plate. Connectors that do not meet the minimum conditions for B, C or D also count as A, as does any other method documented at 185 lb of uplift or more.
- B. Clips. Metal connectors that do not wrap over the truss, or a strap that wraps over but misses the nail pattern of C or D. A purpose-made connector rated at 386 lb or more also qualifies, with site-specific documentation.
- C. Single wraps. One strap wrapped over the truss, with at least 2 nails on one side and 1 on the other, or a purpose-made connector rated at 535 lb or more.
- D. Double wraps. Two straps, one on each side of the truss, each with at least 2 nails on one side and 1 on the other, or a single strap with at least 3 nails on each side, or a purpose-made connector rated at 891 lb or more.
- E. Structural. Anchor bolts structurally connected, or a reinforced concrete roof.
- F. Other. G. Unknown or unidentified. H. No attic access. I. Connections not installed as intended.
For B, C and D, every connection the inspector verifies must also meet minimum conditions: for example, a metal connector held by at least 3 nails, a gap of less than ½ inch, and no visible severe corrosion.
What changes it: a retrofit by a licensed contractor, with documentation. Because the answer is the weakest connection, adding straps on only part of the house usually does not move it.
7. Roof Geometry
- A. Hip roof. No other roof shapes make up more than 10% of the total roof system perimeter. The inspector writes down both lengths in feet.
- B. Flat roof. Only for buildings with 5 or more units, where at least 90% of the main roof area slopes less than 2:12.
- C. Other roof. Anything that does not qualify as A or B, such as most gable roofs.
Porch or carport roofs that attach only to the fascia or wall of the house and cover open space are left out of the measurement. That rule matters for hip roofs that are close to the 10% limit.
8. Sealed Roof Deck (Secondary Water Resistance)
Question 8 of the wind mitigation form asks whether there is a second barrier to keep water out if the shingles or tiles blow off.
- A. Sealed roof deck. Any one of these: a fully adhered polymer-modified bitumen underlayment (ASTM D1970); deck seams taped with a self-adhering strip at least 3.75 inches wide (ASTM D1970) or a flashing tape meeting AAMA 711 Level 3; a double layer of felt or synthetic underlayment with no tape, using the listed standards; or spray foam along the rafter joints and all panel joints.
- B. No sealed roof deck.
- C. Unknown or undetermined.
The wind mitigation form is explicit that standard underlayment or hot-mopped felts do not qualify. Since sealed deck work is hidden under the roof covering, the roofer’s invoice naming the product is often the only proof.
9. Opening Protection
The last question on the wind mitigation form is the most complex. First, the inspector fills a table: one column per opening type and one level per row. Glazed openings are windows, glazed entry doors, glazed garage doors, skylights and glass block. Non-glazed openings are solid entry doors and garage doors.
| Level | What it means |
|---|---|
| A | Verified for cyclic pressure and the large 9 lb missile (4.5 lb for skylights) |
| B | Verified for cyclic pressure and a 4 to 8 lb large missile (2 lb for skylights) |
| C | Verified plywood or OSB panels meeting Table 1609.1.2 of the 2007 Florida Building Code |
| D | Non-glazed entry or garage doors verified for wind pressure only (ASTM E 330, ANSI/DASMA 108 or PA/TAS 202) |
| N | Products that look like A or B but cannot be verified, or other coverings that are not A, B or C |
| X | No wind-borne debris protection |
| Z | Damaged openings that need repair or replacement |
Then the answer. The letter comes from the weakest glazed opening: A if every glazed opening is at least level A, B if at least B, C for verified wood panels, N for unverified systems, X if one or more glazed openings have no protection. The new Z answer flags damaged openings, and the form notes that buildings with openings in need of replacement do not qualify for wind mitigation rate differentials.
The number after the letter describes the non-glazed doors. .1 means they are as strong as the letter, or the house has none. .2 means at least one is a level D door rated for wind pressure only, and none is weaker. .3 means at least one door is weaker than the letter. Gable vents and other roof vents are not part of this question.

Worked example: reading a wind mitigation form, line by line
A hypothetical 2005 home with impact windows
Here is an invented report for a single-family home built in 2005, re-roofed with a permit in 2019. The answers are realistic but made up to show how to read the letters.
| Question | Answer on the report | What it tells you | Could it change? |
|---|---|---|---|
| 1 Building Code | A | Permitted under the 2001/2004 Florida Building Code | No, it is fixed by the original permit |
| 2 Region | Region 2 | Design wind speed of 130 to 139 mph | No, it is the location |
| 3 Roof Slope | Less than 6:12 | A fairly low-pitched main roof | Only with a new roof structure |
| 4.2 Roof Covering | A | The 2019 permit proves code-compliant shingles | Already the top answer |
| 5 Roof Deck | C | 8d nails at 6 inches in the field, seen in the attic and on the roofer’s invoice | Already a strong answer |
| 6 Roof to Wall | B | Clips: the weakest connection found | Only with a documented retrofit of every weak connection |
| 7 Roof Geometry | C | Gable roof | Not without changing the roof shape |
| 8 SWR | A | Taped deck seams named on the 2019 invoice | Already the top answer |
| 9 Opening Protection | A.3 | Every window verified at level A, but the solid garage door has no verified rating | Yes: a garage door with documented protection could lift it |
Two lessons stand out. First, most of the strong answers here came from paperwork kept from the 2019 re-roof, not from what the inspector could see. Second, a single garage door turned the top window answer into A.3. If you are planning upgrades, that is the kind of gap worth asking your insurer about, because a verified rating on one door is a much smaller job than re-strapping a roof.
Decode your own wind mitigation form in 4 steps
- Check the footer. “Rev. 04/26” means the current form. “Rev. 01/12” means the 2012 version: ask your insurer whether it still accepts it.
- Check the date. Add five years to the inspection date. That is the outer limit, as long as nothing material has changed.
- Circle every “unknown”, “other” and “no attic access”. These answers usually mean missing proof, not a weak house.
- Compare questions 5, 6 and 9 with what you know. If you have invoices for a re-nailed deck, straps or rated shutters that your wind mitigation form does not reflect, send them to the inspector and ask whether the answer can be corrected.
7 red flags to check before you sign the wind mitigation form
Your signature only confirms the inspector visited and showed ID. Still, it is the best moment to catch problems, because a correction is easier before the report reaches your agent.
| Red flag | Why it matters | What to do |
|---|---|---|
| Wrong policy number or address | The report may be returned or matched to the wrong policy | Ask the inspector to correct the header before you sign |
| Region or roof slope left blank | Both questions are new and easy to miss on the 2026 form | Ask for them to be completed |
| “Unknown” on question 1 or 4 | Often just a missing permit date | Look up permits with your county or city and send them |
| “No attic access” on 5 or 6 | The two attic answers default to their least useful option | Clear the hatch and ask for a second visit |
| Level N on shutters you paid for | Unverified products rank below A and B | Find labels, product approval numbers or installer paperwork |
| Any Z in question 9 | Damaged openings can block rate differentials | Repair first, then ask for an update |
| No photos attached | Each attribute in questions 2 to 9 needs proof | Ask for the photo pages with the form |
What changed from the 2012 wind mitigation form
The 2026 revision added two descriptive questions (Region and Roof Slope), renumbered the rest, added rated uplift values to the roof-to-wall levels and a damaged-opening answer to opening protection, and lets a FORTIFIED Home Roof, Silver or Gold certificate validate questions 4 to 6, 8 and 9. Our side-by-side table of both versions lists every renumbered question.
One detail from Citizens is worth knowing: its bulletin says the changes and new features do not change the credits it currently applies. Other insurers set their own rates, so ask yours.

If your report shows weak answers on questions 5, 6, 8 or 9, a state grant may help pay to upgrade them. Our My Safe Florida Home guide explains who qualifies, how the $2-for-$1 match works and every deadline.
Frequently asked questions
Can I fill out the wind mitigation form myself?
No. The wind mitigation form has to be completed and signed by a qualified inspector, such as a licensed home inspector with hurricane mitigation training, a licensed contractor, an engineer or an architect. You only sign the homeowner section, confirming the inspection took place.
Where do I get a copy of my wind mitigation report?
Ask the inspector who did it first, then your agent or insurer. If you are with Citizens, its wind mitigation page says the report goes to your agent, who submits it, so your agent should have a copy.
Is the 2012 wind mitigation form still accepted?
For inspections from April 1, 2026, the Rev. 04/26 form must be used. Older Rev. 01/12 reports can still be valid within their five years, and Citizens says it accepts them if they were completed within five years before April 1, 2026. Other insurers may differ, so ask.
Does the wind mitigation form show my discount?
No. The form only records features. Your insurer applies its own credits to each answer. Florida admitted insurers must send a notice of hurricane mitigation discounts with new policies and renewals, which is the place to see how your answers are priced.
How long is a wind mitigation form valid?
Up to five years, provided no material changes are made to the structure and the form has no inaccuracies. A re-roof or new windows are good reasons to get a new one sooner, as our validity worked example shows.
When to call a pro
- Your report has “unknown” or “no attic access” on a question you think your home meets.
- You re-roofed, re-nailed the deck, added straps or replaced windows or doors since the last report.
- Your wind mitigation form is the 2012 version and close to five years old.
- An opening was damaged in a storm.
A qualified inspector can complete a new wind mitigation form. A licensed contractor can retrofit connections, roofing or openings and document the work. If your insurer also wants a 4 point inspection, ask whether the same visit can cover both. For how credits apply to your policy, talk to your insurer or a licensed agent.
Sources
- Florida OIR, Uniform Mitigation Verification Inspection Form OIR-B1-1802 (Rev. 04/26)
- Florida OIR, form OIR-B1-1802 (Rev. 01/12), prior version
- Florida OIR, Wind Mitigation Resources
- Florida Department of Financial Services (CFO), Mitigation Notices, Inspections and Forms
- Citizens Property Insurance Corporation, Uniform Mitigation Verification Inspection Form Changes (March 19, 2026)
- Citizens Property Insurance Corporation, Wind Mitigation Inspections
- Florida Statutes 2026, section 627.711 (Florida Senate)
- ASCE Hazard Tool (design wind speed lookup referenced on the form)
This guide is general information about the Florida wind mitigation form, not insurance, legal or construction advice. Daniel Aznar, who writes this site, is not a home inspector, a contractor or an insurance agent. Forms, rules and insurer requirements change: confirm what applies to your home and policy with your insurer, a licensed agent or a qualified inspector. Read our full disclaimer, and if you spot an error, our corrections page explains how we fix it. Information checked in October 2026.